The project The client had to manage leaks along joints and microcracks in an underground cellar. After preliminary analysis, holes were drilled in the masonry to install mechanical packers. The
The project During the construction of a tunnel, the client encountered a point with particularly large amounts of water inflow, requiring a high-performance injection system. High-resistance packers were installed and
The project The client consolidated the soil beneath a pavement that had localized subsidence. Injection holes were drilled and mechanical packers were positioned. The two-component resin, mixed in a 1:1